Elecq Partner App Guide

Elecq Partner App Guide

Elecq Partner app icon

Use Elecq Partner to set up an installation site. Start by signing in, then enter the details for the location where you’ll install the charger.

Register or log in

  1. Open Elecq Partner

    If you already use the ELECQ App, tap Log In and use the same account. If you’re new to ELECQ, tap Sign Up and follow the registration prompts.

    Elecq Partner welcome screen with Log In and Sign Up
  2. Log in to your account

    Enter your email or phone number and password, then tap Log In. To sign in with a code, select Log In with Verification Code.

    Log In screen with password and verification code options

Create a private site

Start an installation

If you’re setting up your own charger or haven’t been trained as an installer by a partner organization, a private site is usually the quickest and simplest way to get started. Choose Create New Public Site if you need to configure multiple circuits and manage load balancing across them.

On the Install tab, under Personal Installation, tap Create New Private Site.

Install tab showing Create New Private Site

Edit site information

Give the site a name. If you allow Elecq Partner to use your phone’s location during installation, it automatically fills in Region, Address and Time Zone. Check these against the installation site, or set them manually.

Select a field in the screenshot to see how to edit it.

Private site form with Name, Region, Address and Time Zone

Name

Site name editor and Save button

Enter a name you’ll recognize, such as “House in Downtown”, then tap Save.

Once the site details are correct, tap Setup Site to continue.

Set up the site

After entering the site information, tap Setup Site. On 1/4 Settings, review load balancing, network settings, and charger current limits. An asterisk marks a required setting.

Select a setting in the screenshot to see its screen and instructions.

Setup Site, step 1 of 4, showing all six settings

Load Balancing

Load Balancing selector showing five modes

Choose the mode that matches your installation. This choice determines how the chargers share power and what equipment you need to configure.

Off
Use Off only if the site has enough capacity for all chargers to operate at their configured limits. With load balancing off, the system assumes this capacity is available and does not automatically reduce charging power to keep the site within its supply limit. Otherwise, select at least Basic and choose the mode that matches the loads on the circuit.
Basic (no other loads)
Use Basic on a circuit dedicated to charging. The system automatically distributes available power among the chargers and keeps their combined current within the configured Main Breaker limit.
Adaptive (with other loads)
Use Adaptive when chargers share capacity with other electrical loads. The system adjusts charging power as those loads change. Confirm that you have purchased and installed a Power Monitor before configuring this mode.
Solar
Use Solar to coordinate charging with on-site solar generation. Install a Power Monitor before configuring this mode.
Third Party EMS
Use this mode when a third-party energy management system controls charging. Configure the EMS connection using Modbus TCP or Modbus RTU.

Configure Basic mode

In Setup Site → 1/4 Settings → Load Balancing, select Basic (no other loads). Use the installation design to fill in Site Power, then review Network and Charger Settings. The values below illustrate one site.

* Required settings. Read each setting marked with a red asterisk carefully and complete it for your installation.

Basic mode site settings. Select a row to view its setup screen.

Main Breaker

Main Breaker

Enter the site’s main breaker rating in amps and tap Save. Basic mode uses this setting when sharing current among the chargers. The example installation uses 40 A.

When the settings match the installation, tap Next Step.

Add a charger by Bluetooth

Device & Circuit with Bluetooth selected and an empty circuit

On 2/4 Device & Circuit, make sure the charger is powered on. Select By Bluetooth and tap Add Charger under the circuit.

Continue to Circuit Overview →

Configure Adaptive mode

In Setup Site → 1/4 Settings → Load Balancing, select Adaptive (with other loads) when the chargers share the site supply with other electrical loads. Adaptive mode uses site current measurements to adjust the charging current as those loads change.

* Required settings. Complete every setting marked with a red asterisk. Select a row in the screenshot to see its setup instructions.

Adaptive mode settings with Site Current Sensor

Site Current Sensor

Current Sensor list with Power Monitor via Wireless selected

Select the measurement device and connection method used at the site. This example uses Power Monitor via Wireless. If the Power Monitor is connected by RS-485, select Power Monitor via RS-485.

Before selecting another current sensor, confirm that Elecq has integrated that exact device and that you know how to install and configure it. Elecq Partner can configure only devices that Elecq has integrated.

For the setup shown, open Sensor Type and, for a CT, select the matching CT Specification. Tap OK to save the sensor settings.

Continue to Circuit Overview →

Configure Solar Mode

In Setup Site → 1/4 Settings → Load Balancing, select Solar. Choose how the charger uses available solar and grid power, then configure the site current sensor.

* Required settings. Complete every setting marked with a red asterisk. Select a row in the screenshot for instructions.

Solar mode settings with Solar Priority selected

Solar Mode

Solar Mode selector with Only Solar, Solar Priority and Unlimited
Only Solar
Charge only with surplus solar power. The charger never draws power from the grid for charging in this mode. Charging may pause for extended periods when there is too little solar surplus, especially when cloud cover causes output to fluctuate.
Solar Priority
Use surplus solar power first. When solar output falls below the minimum charging current, the charger draws enough grid power to keep charging, up to the limit you set under Solar Settings → Max Current From Grid. This is the recommended starting mode for economical charging across most weather conditions.
Unlimited
Use available solar and grid power to charge within the configured site and charger limits.

Continue to Circuit Overview →

Circuit Overview

After you finish configuring the circuit in 2/4 Device & Circuit, tap Next Step to open Circuit Overview at 3/4 Settings. The review works the same across load balancing modes.

Circuit Overview with the Site tab selected

Check the site name, site ID, region, address and time zone.

After reviewing all three tabs, tap Next Step to open 4/4 Functional Tests.

Continue to Functional Tests →

Functional Tests

Use the final installation step to test each charger before completing setup.

Functional Tests list with a charger marked Untested

On 4/4 Functional Tests, tap the charger you want to test. Repeat the checks for each charger in the circuit.

Continue to Transfer and Use →

Transfer and Use

After functional testing, hand the site over to its owner or let them claim the charger in the Elecq App.

Transfer Owner sheet with Email or Phone and Confirm

After completing the functional tests, tap Transfer at the bottom of Site Info. Enter the email address associated with the owner’s Elecq account, then tap Confirm to give them access to the site.

To skip the transfer, tap the exit icon in the upper-right corner of Site Info. The owner then claims the charger in the Elecq App using its serial number (SN) and PIN.

Modify Completed Site

Review installation history and update a site’s details or configuration in Elecq Partner.

1. Open Sites

On the Install home screen, tap Sites in the bottom navigation.